Select Page

Month: August 2021

New York’s Crotona Park’s historic clock tower lanterns revitalized with EXTECH’s custom glass block assembly

New York City’s Crotona Park’s arched entry to the pool building and play center in the Bronx features a newly reconstructed pair of 80-foot-tall clock towers capped with four-sided glass block “lanterns.” Completed in March 2021, the new lanterns were designed, engineered and fabricated by EXTECH/Exterior Technologies, Inc., and installed by Sandhu Contracting, Inc.

Read More

FGIA offering hands-on demonstration of installation practices during 2021 Hybrid Fall Conference

During the FGIA 2021 Hybrid Fall Conference, participants will have the opportunity to be part of a hands-on demonstration of installation practices driven by consensus-based standards. Those attending the conference in Phoenix, Oct. 18-21, can observe industry experts as they demonstrate installation methods taught as part of the FGIA InstallationMasters® training and certification program.

Read More

Adolfson & Peterson Construction and Douglas Unified School District #27 break ground on Douglas High School expansion and renovation

Adolfson & Peterson Construction and Douglas Unified School District #27 (DUSD) broke ground on an expansion and renovation project for Douglas High School in Douglas, Arizona. The $27 million expansion project includes four new pre-engineered metal buildings encompassing 87,502-SF, additional classrooms, and new athletics equipment and facilities.

Read More

Total construction starts move lower in July

Total construction starts fell 3% in July to a seasonally adjusted annual rate of $854.8 billion, according to Dodge Data & Analytics. There were few bright spots during the month, with all three sectors (residential, nonresidential building and nonbuildings) moving lower in July.

Read More

SOLARBAN® 67 glass adds sustainability, views to new Portland civic center devoted to social equity

As Oregon’s first project to pursue LEED® certification at the Platinum level, the Meyer Memorial Trust in the heart of Portland’s urban community combines investments in social equity and sustainability through building elements that include a saw-toothed photovoltaic (PV) roof, textured metal cladding and large, inviting windows fabricated with Solarban® 67 glass by Vitro Architectural Glass.

Read More

Case Study: University finds an aesthetic acoustic ceiling solution

The newly renovated Campus Center at Mount Saint Mary’s University’s Chalon Campus, Los Angeles, CA, a 4700 square-foot multipurpose event space, was plagued by echoey acoustics that interfered with audibility in the room. The solution turned out to be a simple replacement of the hard ceiling panels with lightweight thermoformed acoustic panels.

Read More

Sentara Brock Cancer Center features Acurlite skylight finished by Linetec in durable anodize

The Sentara Brock Cancer Center was designed by Odell Associates with the patient’s health journey and customer experience as a top priority. Entering through the building’s main entrance, the patients, medical professionals, staff and visitors are warmly greeted and protectively sheltered by a transparent, single-pitch canopy skylight. Manufactured by Acurlite Structural Skylights, the canopy’s aluminum framing system was finished by Linetec in durable, Class I Clear Anodize.

Read More
  • 1
  • 2

Cradle to Cradle Certified products

The Cradle to Cradle program certifies products based on five quality categories—material health, material reutilization, renewable energy and carbon management, water stewardship, and social fairness. Click here to see a list of building supply & materials, as well as other products, that are Cradle to Cradle certified.

SiteLock