Select Page

Author: PRISM

New School of Medicine Education Building promotes inclusive and innovative learning environments

The Regents of the University of California confirmed the selection of Hensel Phelps + CO Architects as the design-build partner for the project.  The team was selected by the School of Medicine Education II working group and the UCR Office of Planning, Design, and Construction following a design-build competition.  The project is starting immediately and is scheduled to break ground in early Summer 2021.

Read More

Macmillan Learning tenant improvement project in Austin, Texas

The Cushing Terrell-designed tenant improvement project for Macmillan Learning’s 32,000-square-foot office in Austin, Texas supports their goal to cultivate knowledge sharing among customers and team members alike. A publishing company that develops digital tools for the education industry, their mission is to enrich lives through learning.

Read More

Wendy’s Quality Supply Chain Co-op, Inc. teams with Tubelite Inc.

Tubelite Inc. announces an agreement with Wendy’s Quality Supply Chain Cooperative (QSCC) to supply architectural aluminum products for “Smart 2.0” prototype restaurants in the U.S. Wendy’s® Smart 2.0 prototypes are part of its “Smart Family of Designs” portfolio offering franchisees development options, including smaller footprint buildings.

Read More

Wheeler Kearns Architects break ground on the Great Lakes Academy expansion in Chicago

Wheeler Kearns Architects has commenced construction on its 130,000 square foot expansion of Great Lakes Academy, a K-8 charter school in South Chicago, which will more than double the size of the school.
The ambitious project entails connecting its current location — a three-story brick masonry building built in 1911 — to the neighboring one — a former Catholic Church built in 1952 — through a one-story glass link.

Read More

Resilient masterplan in Los Angeles will create human-scaled mixed-use neighborhood

Continuum Partners and Los Angeles Cold Storage have submitted a development application with the City of Los Angeles to reimagine a Downtown gateway site. The project, dubbed Fourth & Central, calls for 1,521 residential units, 401,000 square feet of creative office space, 93,000 square feet of retail/restaurant use, and a 68-room hotel. The project’s master plan and project architecture are by Los Angeles-based Studio One Eleven. Two marquee buildings are designed by David Adjaye.

Read More

Banker Wire mesh adorns expansive ceiling installation anchoring five-story atrium

For the design of a new prominent corporate office headquarters located in Little Rock, Arkansas, Polk Stanley Wilcox Architects utilized Banker Wire’s SZ-4 wire mesh pattern—in a stainless steel and brass mixed alloy—to create a striking ceiling installation. Bridging two separate, glass-clad office spaces linked by a five-story, atrium-like structure, the wire mesh-fabricated ceiling visually anchors the interior as a key focal point.

Read More

Stantec-designed Adela at MiMo Bay residential building is complete

Stantec announces the completion of the new five-story Adela at MiMo Bay apartments located next to Legion Memorial Park in Miami’s Upper Eastside. The project features 236 residential units, pool deck with panoramic views of Biscayne Bay, a 370-space parking garage, and a new 15,000 square-foot American Legion Post 29 facility. Stantec provided architecture, structural engineering, MEP engineering, and interior design services for the project.

Read More

Cradle to Cradle Certified products

The Cradle to Cradle program certifies products based on five quality categories—material health, material reutilization, renewable energy and carbon management, water stewardship, and social fairness. Click here to see a list of building supply & materials, as well as other products, that are Cradle to Cradle certified.

SiteLock