Select Page

Author: PRISM

Building Seismic Safety Council updates earthquake design provisions for FEMA

The National Institute of Building Sciences Building Seismic Safety Council (BSSC) recently updated seismic provisions for the National Earthquake Hazards Reduction Program (NEHRP). The 2020 NEHRP Provisions (FEMA P-2082) were developed by BSSC and published by the Federal Emergency Management Agency as part of an ongoing program to advance national seismic design standards and model building codes.

Read More

AIA releases updated contracts for multi-family residential and prototype residential projects

The American Institute of Architects (AIA) is releasing updated contract documents today, including two key residential contracts and a complimentary Condominium Project Guide. Revised residential contract documents address insurance requirements, post-occupancy site visits and maintenance requirements. The updated B109™-2020, Standard Form of Agreement Between Owner and Architect for a Multi-Family Residential or Mixed Use Residential Project now includes a new, optional limitation of liability.

Read More

RDC opens San Diego office

RDC, has opened offices in San Diego at 101 West Broadway in downtown San Diego, and has named RDC Principal Sean Slater, AIA, as Principal-In-Charge of the new office. Under the leadership of Slater and RDC Senior Principal Mitra Esfandiari, AIA, the design staff at the firm’s Long Beach headquarters has created a portfolio of San Diego projects that includes the multi-phase repositioning of Del Mar Highlands Town Center, the redevelopment of Horton Plaza, renovations at Fashion Valley Mall, new mixed-use at Costa Verde Center, and several new high-rise multifamily communities in early planning phases.  

Read More

FMA, FGIA, WDMA release new guidelines for replacement of windows without removal of exterior brick veneer

The Fenestration Manufacturers Association (FMA), the Fenestration and Glazing Industry Alliance (FGIA) and the Window & Door Manufacturers Association (WDMA) have released a new document focused on replacement windows. FMA/AAMA/WDMA 2710-20, Guidelines for the Full Frame Replacement of Windows without Removal of Exterior Brick Veneer, covers the replacement of windows in residential and light commercial buildings of not more than three stories above grade in height, utilizing a membrane/drainage system, a surface barrier drainage or a wall system without a reliable membrane drainage system.

Read More

Cradle to Cradle Certified products

The Cradle to Cradle program certifies products based on five quality categories—material health, material reutilization, renewable energy and carbon management, water stewardship, and social fairness. Click here to see a list of building supply & materials, as well as other products, that are Cradle to Cradle certified.

SiteLock